Product Attribute
Model NO.: D15 D20 D25 D28 D32 D36 40 D50
Lane Position: Half Through Bridge
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
Stress Characteristics: Beam Bridge
Processing Service: Bending, Welding, Decoiling, Cutting, Punching
Application: Steel Structure Bridge
Packing: Standard Containers
Transport Package: Packing in Containers or Bulk
Specification: 45/60/90/120/135
Production Capacity: 500000PCS/Year
Package Size: 300.00cm * 150.00cm * 75.00cm
Package Gross Weight: 1000.000kg
Lead Time: 7 days (1 - 1000 Pieces) 14 days (1001 - 5000 Pieces) To be negotiated ( > 5000 Pieces)
Main Products: Post, Tension, Bar, Prestressed, Anchorage, Threaded, Rod, Bolts, and, Nuts, Screws, Bailey, Bridge, Components, Wire, Rope