Factory Supplied High Strength G80 Load Chain
Product Attribute
Surface Treatment: Polishing
Process: Welded+Heat Treatment+Surface Treatment
Trade Term: Fob, CFR, CIF
Lead Time: Within 15 Works Days After Receive Deposit
Packaging: Packed in Wooden Case/Iron Drum, Then in Pallets
Transport Package: Packed in Wooden Case/Iron Drum, Then in Pallets
Production Capacity: 150 Tons/Month
Main Products: Chain, Master, Link, Rigging, Shackle, Hook, Tire, Skidder, Chain, Load, Binder, Chain, Sling, Other, Hardware, Accessories, Lashing, Chain, Pallet, Truck, Connecting, Link